Chasing an information request to an answer
Logging and routing, then chasing, then propagating the answer to the drawing set and the affected subcontractor. The propagation step is the one that gets skipped, and it is the one that causes rework.
The estimate, the project system and the accounting system each hold a cost code structure, and the mapping between them lives in a spreadsheet maintained by one person.
A project generates a paper chain where each hop is a re-keying. A field condition becomes a time and materials tag, then a potential change order, then a priced request, then an executed change order, then a budget revision, then a line on the next payment application. Every hop is a place the amount can quietly diverge.
- Procore
- Outlook
When this is the wrong thing to build
Pick something else if the design team is unresponsive for reasons no system will fix. Chasing faster changes the relationship rather than the answer date.
The constraint that shapes it
Lien deadlines are statutory, vary by state and by role, and run from a furnishing date rather than from an invoice date. More on how this sector works.
A list of things that are missing, worked until it is empty. Read what this shape is, or start from one of these.
- Chasing a compliance file to complete
- Chasing a referral fee through to a closing you cannot see
- Asking for the replenishment before the retainer runs to zero
- Chasing medical records until the set is complete
- Getting a deposition on the calendar of every party
- Chasing the warranty credit the distributor has not issued
- How do I stop an RFI sitting unanswered with the architect?
- Who needs an RFI answer besides the person who asked?
- How do I get an RFI response onto the current drawing set?
- How long should an RFI response take under the contract?